Coesum is structured to follow the series production of parts in plastic and aluminum through the construction of definitive molds in aluminum, hardened or tempered steel. Our experience is mainly concentrated in the production of small lots that do not exceed thousands of units per year.
In co-design with the customer the team of our technical department follows the mold design. To satisfy the multiple requests, for over 20 years we have consolidated a network of partners in China and other areas of Eastern Europe that follow us in the production of molds.
COESUM service provides for the complete management of the project, from the design of the equipment to the plastic molding or die-casting of aluminum and zamak.
COESUM is equipped with an internal mechanical workshop for the management of modifications and maintenance also extraordinary on molds as well as on production parts.
Generally we make the production directly here in Italy to control the procurement of the raw material also certified, and to satisfy material requests like ROHS, REACH, self-extinguishing, medical, food certification.
In our interior we also have an optical scanner to reverse engineer disused equipment for new chianges or to control on-production parts with dimensional reports.
How are mold ownership, storage, and maintenance managed?
Ownership, storage location, routine maintenance, modifications, and transfer arrangements should be specified in the quotation or contract. It is also useful to define the expected service life, critical spare parts, and end-of-production procedures.
Where might the injection gate, parting line, and ejector marks appear?
Their positions are established during mold design, taking into account filling, ejection, and cosmetic quality. Visible and functional surfaces should be identified in advance to minimize unwanted marks.
How are tolerances and dimensional inspections defined?
Tolerances must be consistent with the component’s function, material, dimensions, and process capability. Critical dimensions, measurement methods, inspection frequency, and acceptance criteria are defined in the control plan.
What is checked during the first molding trial?
Filling, shrinkage, warpage, ejection, appearance, and functional dimensions are checked. The first molded parts help identify any required adjustments to the mold or process parameters before production approval.
How are the number of cavities and mold configuration determined?
The choice depends on annual volumes, cycle time, part dimensions, available injection molding machine, and planned investment. A multi-cavity mold reduces unit cost but requires a higher initial investment and more complex balancing.
Can different materials be molded into the same component?
Yes, through overmolding or multi-material molding, provided the materials, geometries, and processing temperatures are compatible. Bonding, deformation, interface sealing, and the manufacturing sequence must be verified.
Can metal inserts be incorporated into the component?
Yes. Bushings, threaded inserts, contacts, or metal reinforcements can be placed during molding or assembled afterward. The best approach depends on loads, accuracy, volumes, automation, and whether the insert needs to be replaceable.
How are undercuts and geometries that are difficult to demold handled?
Slides, moving inserts, unscrewing mechanisms, or other dedicated solutions may be required. These systems increase mold complexity, maintenance, and cost, so their use should be evaluated against the component’s actual functional requirements.
Why is uniform wall thickness important?
Excessive variations in wall thickness can cause differential shrinkage, warpage, sink marks, and longer cycle times. Where greater stiffness is needed, ribs and fillets are often preferable to locally increasing material thickness.
Does the selected material also affect mold construction?
Yes. Glass-fiber-reinforced polymers and other filled materials can increase tool wear and require specific steels or surface treatments. Material selection, expected mold life, and production volumes should therefore be considered together.
How is the plastic material selected?
Selection takes into account stiffness, impact resistance, temperature, chemical exposure, wear, weight, and surface finish. Shrinkage, flow properties, dimensional stability, commercial availability, and regulatory requirements must also be assessed.
Is it advisable to make a prototype before building the mold?
Yes, especially after optimizing the component for injection molding. An updated prototype allows overall dimensions, fits, assembly, and ergonomics to be checked before authorizing tooling manufacture.
Can an existing component design be injection molded without modifications?
Not always. The model must be reviewed for wall thicknesses, draft angles, radii, undercuts, ribs, parting lines, and ejection requirements. Any necessary changes are defined before mold design begins.
What information is needed to assess the mold and production process?
A 3D CAD model, technical drawing, annual volumes, batch sizes, material, and surface finish are required. Tolerances, operating conditions, certifications, inspection requirements, and expected volume growth should also be specified.
When is injection molding the right choice for manufacturing a component?
Injection molding is suitable for high-volume production that justifies the initial investment in tooling. Its cost-effectiveness depends on annual volumes, product lifespan, material, geometry, and target unit cost.

